It was one of the major project singed to us. Under this we are working on detailed survey, designing and drawing, Construction of R.C.C. Intake Well cum Pump House ,R.C.C. Gangway 183 M long and 3.00M wide, 7.50 MLD capacity Conventional Water Treatment Plant, RCC Elevated Service Reservoir – (i) 5.60 Lakh Litre capacity with 24 M Staging, (ii) 3.70 Lakh Litre capacity with 22 M Staging, (iii) 5.80 Lakh Litre capacity with 24 M Staging, (iv) 2.25 Lakh Litre capacity with 21 M Staging, (v) 4.75 Lakh Litre capacity with 10 M Staging, Staff Quarter, Compound wall, Approach road, Supplying and laying Raw and Clear Water rising main and Distribution Network, House Connection, Supplying and Installation of VT and Centrifugal pump motor, Five years operation & maintenance with allied works etc. all complete job .
