It was one of the major works executed by us. Under this we are working on detailed survey, designing and drawing, Construction of R.C.C. Intake Well cum Pump House ,R.C.C. Gangway 360 M long and 4.00 M wide, 12.20 MLD capacity Conventional Water Treatment Plant, RCC Elevated Service Reservoir – 10 nos., RCC Ground Service Reservoir – 1 no., Staff Quarter, Compound wall, Railway Crossing, NH Crossing, Supplying and laying Raw and Clear Water rising main and Distribution Network, House Connection, Supplying and Installation of VT and Centrifugal pump motor five years operation & maintenance with allied works etc. all complete job .
